| Client |
TurkmenGaz |
 |
|
Location |
South of Yoloten in the
Karakum desert, spanning the Murghab river, province of Mary,
Turkmenistan |
| Project |
Infield, processing
4.5% H2S gas, and export 20BCMA sales gas |
| Duration |
2009 - 2010 |
| Scope |
Front-end design through estimate,
then EPC of well gathering systems, infield gas treating, central
processing, export of gas, stabilized condensate and pelletized sulphur.
Petrofac contract for northern part of field, with Hyundai building two
gas trains. |
| Role |
HSE Design in
FEED phase, then client "Technical Issues Coord." |
| Tasks |
Front End Design
- Guidance & review of HSE Design Philosophies & Studies
- Member of our internal PMC team on behalf of the client
- Input/guidance to EIA subcontractor,
RSK Environmental
- Supported EIA with maps for villages and logistic routes
- Supported risk assessment for sanitary protection zones, spacing
of flares and high-pressure amine absorbers.
In-Country Coordination
- Based in Mary, close to TurkmenGaz office
in Shatlyk
- Met weekly to close-out queries by TMG &/or
Petrofac
- Coordinated planning for land allocation
for pipelines,
river crossing, gas treating units, wells & project roads
- Met with Chinese Petroleum Engineering,
Gulf Oil & Gas
&/or Hyundai Engineering as needed on common issues
Overall Field Layout
- Coordinated development of field maps,
synchronizing spatially accurate info from purchased high-res
satellite imagery, Garmin GPS routes, field survey, Google Earth

|