ADMA-Opco: Habshan
Alpha Platform FEED
back to Projects index
| |
|
 |
| Client |
ADMA-Opco |
| Location |
Abu Dhabi Umm Schaif field |
| Project |
HAP platform FEED design |
| Duration |
Second half 2007 at
Fluor |
| Scope |
HSE deliverables for sour, wet gas
4-level processing platform |
| Role |
Mainly HSE third-party contracts for HSEIA, QRA,
HAZOP, SIL |
| Tasks |
- Took over HSE Lead, while still leading another project
- Dealt with SOWs and Contracting strategy
for services
- Managed switch from one subcontractor to another and updated the
scheduling to integrate all their efforts
- Tracked against already submitted HSE Plan to ensure all project
deliverables are completed, and squad checked
- Worked with Project Management Consultants (KBR) to agree on
strategy for fire protection, detection and SIL
- Directed design for fire protection, fire &
gas detection, temporary refuge, emergency egress and fireproofing
- Ensured squad check of other discipline's
packages to pick up and resolve items requiring HSE input/decisions
- Manage integration of HAZOP action items
with list of outstanding design issues for P&ID "Issue for Design"
- Developed design packages for fire
protection equipment developed firewater P&ID, and piping material
selection
- Agreed on SIL strategy, and contracted for
SIL workshop
- Participated in 3-D model review of access,
egress, F&G
|
|