Marathon Garyville:
Kerosene Hydrotreater and Hydrocracker
back to Projects index
| Client |
Marathon Petroleum
Company |
 |
| Location |
Garyville, LA |
| Project |
Garyville Major
Expansion |
| Duration |
1st half 2007 at
Shaw S&W |
| Scope |
Detail Engineering,
HAZOP
and Procurement of
GME "Kerosene Hydrotreater" & "HydroCracker" |
| Role |
Senior Process Systems Engineer for KHT and HCU
Units |
| Tasks |
- Validation of "FEED" package, as received
from Fluor Corp
- Hydraulics of process pumps to confirm NPSH
and Delta-P
- Checked P&IDs vs. Data Sheets consistency /
omissions
- Checked P&IDs Line
Numbers, PSVs and CVs per spec'ns
- Developed min. nozzle standards to control
quill depths
- Developed combined OWS design for
rainwater/firewater
- Developed smart spreadsheet to automate OWS
analyses, determining controlling case (firewater vs. rainwater) and
selection of slopes vs. sizes, based upon available depth
Process Systems work, based on final IFD equipment layout:
- Detail design of ISBL Fire Protection pump
deluge system
- Coordinate layout with OSBL for FW, OWS &
SS interfaces
- Potential to consolidate process drain
hubs, OWS sewers
- Complete Line List with Design, Test cond'ns, Paint/Insul
|
|