Scope of Carpentry Work for Admin. Office
See Admin Office & New-Uses drawings for the new floor plans.
First Phase of Carpentry
1A Replace solid door to office with a steel, window-paned door
1B Cut hole in door core to Rector office: install 24" horiz. slider
1C Cut hole in center of former stage wall, install 36" steel door
1D Build a framed wall
between Admin. Office and Storage Area
1E Build closet walls as shown within lower Admin.
office area
1F Install a 32" steel door centered on the new closet space
After all electrical, Ethernet & voice cabling installed, do 2nd phase
2A
Sheetrock new walls both sides, use 1/2" sheetrock & screws
2B Tape seams, mud, float, and sand ready for painting by
others