2008 Ras Tanura
Integrated Project, Saudi Arabia
2007
Did sizing and hydraulics for unit-level OWS system
capacity to handle equipment loss of containment plus 10-year rain storm.
Worked
with Piping on 3D model for underground to ensure no conflicts with storm sewer
or fire main.
·
Sized,
specified and requisition new package cooling tower to handle new S-Zorb and
ULSD units. · Ran FlareNet model for extension of new 18” flare header into existing 24” to flare knockout drum. · Ran a case study for their coldest day to ensure no condensation in event C4/C5 mix release to flare
As part of process study of options for Canadian extra heavy crude oil, was responsible for the baseline history of steam, fuel, water and hydrogen. Used “PI” historian to establish annual mean, maximum and seasonal variations. Evaluated opportunity to use one of the two existing flares for new/modified units and demonstrated a third flare was required. Reviewed on-site vs. pipeline terminal storage options for product movements by ship and/or pipeline.
1998-2005
Environmental Protection Agency As internal consultant to DynCorp – later CSC - supported multiple Work Assignment Managers in EPA Oil Spill program on mitigation options for above-ground, below ground and pressurized storage systems. Was expert reviewer of technical guidance to P.E’s in their development and oversight of a client SPCC plan.
1993-1995
Mobil R&D Corporation Chaired API’s MACT subcommittee for storage tanks, on external seal/internal floater design options to reduce emissions for promulgated Refinery MACT rule. Under EPA’s Emission Inventory Improvement Program worked with the developer of “TANKS” software to extend its capability to more tank designs.
1985–1987
New Zealand Synthetic Fuels Conducted commissioning performance tests on all O&U systems for a $NZ 1.2 billion synthetic fuels complex. This included instrumenting a 300-meter long cooling tower for CTI test. Other systems tested were demineralization, reverse osmosis, cryogenic nitrogen generation, waste water treatment.
1977-1981
PetroUnited Terminals, Bayport & · Master-planning for specialty chemical storage, marine load/unload and design of wastewater treatment. · Responsible for detailed design of 100,000 bbl butadiene storage tank at atmospheric pressure.
1976–1978
Intercontinental Terminals, · Did refrigeration requirements, storage system design of four 65 ft diam butadiene spheres · Treatment of dilute chemical wastewater with large equalization/FW pond and trickling filter.
·
Did permitting and layout for an 18-bay loading rack for
gasoline tankers delivery by road. |
| |||||||||