PROFILE:
Utilities & Offsites - Flares, Water, Steam, Gas, Storage |
![]() |
![]() |
![]() |
![]() |
20092010 TurkmenGaz
South Yoloten Gas Field
Worked
with client on location and distribution planning for six-pump station on 24"
water line across the Karakum desert. Gave input into sizing basis and site
layout for gas-fired power generation.
2008
Ras Tanura
Integrated Project, Saudi Arabia
Interface coordinator between licensed process
units and infrastructure, including all piping, racks, roads, cables and safety
systems
2007
Did sizing and hydraulics for unit-level OWS system
capacity to handle equipment loss of containment plus 10-year rain storm. Worked
with Piping on 3D model for underground to ensure no conflicts with storm sewer
or fire main.
2006
Giant Refinery,
Sized,
specified and requisition new package cooling tower to handle new S-Zorb and
ULSD units.
Did detailed design of cooling water intake for vertical
pumps per the Hydraulic Institute standards
Ran FlareNet model for extension of new 18 flare header into existing 24 to flare
knockout drum
Ran
a case study for their coldest day to ensure no condensation in event C4/C5 mix
release to flare
2005-2006 BP Refinery,
As part of process study of options for Canadian extra
heavy crude oil, was responsible for the baseline history of steam, fuel, water
and hydrogen. Used PI historian to establish annual mean,
maximum and seasonal variations. Evaluated opportunity to use one of the
two existing flares for new/modified units and demonstrated a third flare was
required. Reviewed on-site vs. pipeline terminal
storage options for product movements by ship and/or pipeline.
1998-2005
Environmental Protection Agency
As internal consultant to DynCorp later CSC -
supported multiple Work Assignment Managers in EPA Oil Spill program on
mitigation options for above-ground, below ground and pressurized storage
systems. Was expert reviewer of technical guidance to P.Es
in their development and oversight of a client SPCC plan.
1993-1995
Mobil R&D Corporation
Chaired APIs MACT subcommittee for
storage tanks, on external seal/internal floater design options to reduce
emissions for promulgated Refinery MACT rule. Under EPAs Emission
Inventory Improvement Program worked with the developer of TANKS software to
extend its capability to more tank designs.
19851987 New
Zealand Synthetic Fuels
Conducted commissioning performance tests on all O&U
systems for a $NZ 1.2 billion synthetic fuels complex. This included instrumenting a 300-meter long cooling tower for CTI test.
Other systems tested were demineralization, reverse osmosis, cryogenic nitrogen
generation, waste water treatment.
19771981
PetroUnited Terminals, Bayport &
Master-planning
for specialty chemical storage, marine load/unload and design of wastewater
treatment.
Responsible
for detailed design of 100,000 bbl butadiene storage tank at atmospheric
pressure.
19761978
Intercontinental Terminals,
Did refrigeration requirements, storage system design of
four 65 ft diam butadiene spheres
Treatment
of dilute chemical wastewater with large equalization/FW pond and trickling
filter.
Did permitting and layout for an 18-bay loading rack for
gasoline tankers delivery by road.
![]()