PROFILE:
Storage Layout,
Design, Permits
and Regulation |
 |
 |
 |
2005-2006 BP Refinery, Cherry Point, WA
As part of
process study of options for Canadian extra heavy crude oil, reviewed on-site
vs. pipeline terminal storage options for product movements by ship and/or
pipeline. This included strategy for partial/total turnarounds, batching
product through shared pipeline, feasible blendstock storage requirements for
summer/winter and different grades.
1998-2005
Environmental Protection Agency
As internal consultant to DynCorp –
later CSC - supported the EPA Oil Spill program. This included development of
an intranet GIS inventory of tank capacities at risk from flood or sabotage.
Was expert reviewer of technical guidance to P.E’s in
their development and oversight of a client SPCC
plan. In the Emission Inventory Improvement Program (EIIP)
worked with EPA air specialists at Research
Triangle Park
to complete EIIP manuals for many industries,
including storage/distribution for oil & gas, refined fuels, specialty chems.
1993-1995 Mobil R&D
Corporation
Chaired
API’s
MACT subcommittee for storage tanks, on external seal / internal floater design
options for reducing emissions for promulgated Refinery, Distribution and
Marine Loading MACT rules. Affirmed technical feasibility of
upgrading BACT facilities for ambient and refrigerated loading arms, vapor
recovery systems.
1980
Exxon Chemical Propylene Storage
Design of storage facility for six propylene bullets and transfer system
controls in West Baton Rouge
1979
– 1981 Independent Liquid Terminals Association
•
Active
associate member in association meetings, sharing advice on storage terminal
design
•
Presented papers on tank truck loading/unloading
vapor recovery to different types of tank.
1977 – 1981 PetroUnited Terminals,
Bayport & Texas City
•
Master-planning for
specialty chemical storage, marine and rail loading and unloading
•
Led the detailed design of 100,000 bbl butadiene storage tank at
atmospheric pressure.
1976 – 1978 Intercontinental Terminals, Deer Park
•
Did refrigeration
requirements, storage system design of four 65 ft diam
butadiene spheres
•
Did permitting and layout for an 18-bay loading rack
for gasoline tankers deliveries by road.
1974 –1975
Stinnes Chemicals, Houston Texas
•
Redesigned their drumming and drum loading operations to
comply with SPCC requirements.